Workshop Time Allocation

Allocate a workshop period to mini-lesson, independent work, and share.

Description

A workshop period reserves time for a mini-lesson and sharing, leaving the remainder for work.

A workshop period reserves time for a mini-lesson and sharing, leaving the remainder for work. Percentages show how the two reservations use the full period.1

Allocate a workshop period to mini-lesson, independent work, and share.

When to use Workshop Time Allocation

Use this tool to allocate a workshop period to mini-lesson, independent work, and share.

Prepare the lesson timeline, roster, observations or assessment labels requested. Use consistent units and exact identifiers, then choose comparison criteria appropriate to the activity.

How to use Workshop Time Allocation and understand its results

  1. Prepare the lesson timeline, roster, observations or assessment labels requested. Use consistent units and exact identifiers, then choose comparison criteria appropriate to the activity.
  2. Enter lessonMinutes, miniLessonMinutes, shareMinutes using the field table and calculation rules, then run the tool.
  3. Read workMinutes, miniLessonPercent, sharePercent. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
lessonMinutesLesson minutesnumberRequired
miniLessonMinutesMini lesson minutesnumberRequired
shareMinutesShare minutesnumberRequired

Enter positive lesson minutes and nonnegative mini-lesson/share times whose sum does not exceed it. Return remaining work minutes and the two percentages. Equality leaves zero work time.

work=lesson−miniLesson−share; phasePercent=100 phase/lesson

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
workMinutesWork minutesnumber
miniLessonPercentMini lesson percentnumber
sharePercentShare percentnumber
json
{
  "input": {
    "lessonMinutes": 50,
    "miniLessonMinutes": 10,
    "shareMinutes": 5
  },
  "output": {
    "workMinutes": 35,
    "miniLessonPercent": 20,
    "sharePercent": 10
  }
}

Limitations and assumptions

No transition allowance, learner pace or educational effectiveness is modeled.

Numeric inputs must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Gradual Release Phase Tracker: Track modeling, guided practice, and independent work in gradual release. For a complementary task, use Think Pair Share Timeline: Schedule think, pair, and share phases with pair count.

References

  1. Workshop Time Allocation — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies