Polarity Duty Cycle

Break down positive/negative ionization duty cycle and switching overhead.

Description

Polarity switching divides an acquisition cycle between positive-mode dwell, negative-mode dwell and overhead.

Polarity switching divides an acquisition cycle between positive-mode dwell, negative-mode dwell and overhead. Overhead reduces the share devoted to signal acquisition.1

Break down positive/negative ionization duty cycle and switching overhead.

When to use Polarity Duty Cycle

Use this tool to break down positive/negative ionization duty cycle and switching overhead.

Prepare the measured profile, formula counts, upstream model outputs or caller-defined reference criteria requested. Keep paired entries aligned and units, sample basis and preprocessing consistent.

How to use Polarity Duty Cycle and understand its results

  1. Prepare the measured profile, formula counts, upstream model outputs or caller-defined reference criteria requested. Keep paired entries aligned and units, sample basis and preprocessing consistent.
  2. Enter positiveDwellMs, negativeDwellMs, switchingOverheadMs using the field table and calculation rules, then run the tool.
  3. Read cycleMs, positiveDutyPercent, negativeDutyPercent, overheadPercent. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
positiveDwellMsPositive dwell msnumberRequired
negativeDwellMsNegative dwell msnumberRequired
switchingOverheadMsSwitching overhead msnumberRequired

Enter nonnegative durations on the same time basis with positive total. Include overhead once for the whole cycle. Return total and the three percentage shares.

cycle=positive+negative+overhead; share%=100 duration/cycle

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
cycleMsCycle msnumber
positiveDutyPercentPositive duty percentnumber
negativeDutyPercentNegative duty percentnumber
overheadPercentOverhead percentnumber
json
{
  "input": {
    "positiveDwellMs": 50,
    "negativeDwellMs": 30,
    "switchingOverheadMs": 20
  },
  "output": {
    "cycleMs": 100,
    "positiveDutyPercent": 50,
    "negativeDutyPercent": 30,
    "overheadPercent": 20
  }
}

Limitations and assumptions

Instrument switching behavior and required sampling density are not modeled. Include all relevant overhead in the supplied duration.

Numeric inputs must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use DDA Cycle Budget: Calculate top-N DDA scan-cycle time and remaining budget. For a complementary task, use DIA Window Planner: Partition a DIA m/z span into contiguous isolation windows.

References

  1. Polarity Duty Cycle — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies