Decision Latency From Explicit Dates Tool

Calculate decision latency from explicit dates from explicit caller-supplied inputs.

Loading tool…

Description

Return elapsed and elapsed minus pauses as activeLatency.

Schedule differences use a common time coordinate and may preserve negative slack or lead times. A scalar lag or float term does not recalculate a full dependency network.

Return elapsed and elapsed minus pauses as activeLatency.

When to use this tool

Use Decision Latency From Explicit Dates when you need one explicit scheduling or delay-budget component.

How to use the tool and how it works

  1. Enter requestTime, decisionTime, pausedDuration. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read elapsed, activeLatency. Use the output convention below.

Require decisionTime ≥ requestTime and pausedDuration within elapsed time. Return elapsed and elapsed minus pauses as activeLatency.1

Input fieldMeaning and unitsAccepted input
requestTimeRequest TimeRequired. Finite number.
decisionTimeDecision TimeRequired. Finite number.
pausedDurationPaused DurationRequired. Finite number; minimum 0.
Output fieldInterpretationReturned shape
elapsedElapsedRequired. Finite number.
activeLatencyActive LatencyRequired. Finite number.
json
{
  "input": {
    "requestTime": 10,
    "decisionTime": 40,
    "pausedDuration": 5
  },
  "output": {
    "elapsed": 30,
    "activeLatency": 25
  }
}

Limitations and assumptions

  • Use compatible time units; pause intervals, business calendars, and causes of delay are not inferred.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Use a complete dependency plan and working calendar to assess critical paths, resource constraints, and completion forecasts.