Diode-Bar Coupling Budget

Combine lenslet, alignment, and fiber-coupling efficiencies into a throughput budget.

Description

A coupling budget multiplies sequential stage efficiencies.

A coupling budget multiplies sequential stage efficiencies. Output brightness is simply scaled by that aggregate throughput in this model.1

Combine lenslet, alignment, and fiber-coupling efficiencies into a throughput budget.

When to use Diode-Bar Coupling Budget

Use this tool to combine lenslet, alignment, and fiber-coupling efficiencies into a throughput budget.

Prepare the optical measurements, geometry, fitted coefficients or caller-selected thresholds requested. Confirm wavelength, radius/diameter, pulse-width, angle and unit conventions before running the calculation.

How to use Diode-Bar Coupling Budget and understand its results

  1. Prepare the optical measurements, geometry, fitted coefficients or caller-selected thresholds requested. Confirm wavelength, radius/diameter, pulse-width, angle and unit conventions before running the calculation.
  2. Enter stageEfficienciesPercent, inputBrightness using the field table and calculation rules, then run the tool.
  3. Read throughputPercent, outputBrightness. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
stageEfficienciesPercentCoupling-stage efficiencies (%)list of numberRequired
inputBrightnessInput brightnessnumber; minimum: 0Required

Enter nonempty efficiency list with every value 0–100% and nonnegative input brightness. Return throughput and scaled brightness.

throughput%=100Π(efficiency_i/100); outputBrightness=inputBrightness×throughput/100

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
throughputPercentTotal throughput (%)number; minimum: 0; maximum: 100
outputBrightnessOutput brightnessnumber; minimum: 0
json
{
  "input": {
    "stageEfficienciesPercent": [
      80,
      90,
      50
    ],
    "inputBrightness": 100
  },
  "output": {
    "throughputPercent": 36,
    "outputBrightness": 36
  }
}

Limitations and assumptions

No etendue, angular redistribution, coherence or actual radiance model is supplied.

Numeric inputs must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Lists are limited to 100,000 entries; the rules above may require smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Power-Beaming Efficiency: Calculate end-to-end optical power-beaming efficiency and power loss. For a complementary task, use Fiber Delivery Power Margin: Check fiber-delivery intensity and nonlinear phase against supplied limits.

References

  1. Diode-Bar Coupling Budget — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies