Skip to content

Main content

Critique Duration Per Participant Tool

Calculate critique duration per participant from explicit caller-supplied inputs.

Loading tool…

Description

Return supplied critique duration per participant.

Studio-class budgets allocate supplied time, turns, places and materials. Reserved quantities and shared work affect the reporting denominator, and a negative remainder or undefined per-person amount is useful bookkeeping information. These arithmetic checks do not assess learning quality, accessibility or whether a real class can safely perform an activity.

Return supplied critique duration per participant.

When to use this tool

Use Critique Duration Per Participant when checking the stated studio allocation, participation, capacity or time budget.

How to use the tool and how it works

  1. Enter duration, participants. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read durationPerParticipant. Use the output convention below.

Return supplied critique duration per participant. Require duration >= 0 and whole participants >= 1; durationPerParticipant = duration/participants.1

Input fieldMeaning and unitsAccepted input
durationElapsed duration in the common time unit specified above.Required. Finite number; minimum 0.
participantsParticipantsRequired. Safe integer; minimum 1.
Output fieldInterpretationReturned shape
durationPerParticipantDuration Per ParticipantRequired. Finite number.
json
{
  "input": {
    "duration": 60,
    "participants": 12
  },
  "output": {
    "durationPerParticipant": 5
  }
}

Limitations and assumptions

  • This is an equal-share budget, not actual speaking time, discussion quality or a recommended session length.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Review the actual class plan, learner needs, usable resources and supervision requirements before organizing an activity.

References

  1. Calculation and input contract: art-education/critique-duration-per-participant — tool.io

Similar or alternative tools