Procurement Bid Bond Share Tool

Express a recorded bid bond as a share of the bid amount without selecting a procurement requirement.

Loading tool…

Description

Divide nonnegative bondAmount by positive bidAmount for bondFraction and multiply by 100 for bondPercent.

Public-sector budget and procurement quantities use specified amounts, contribution shares, and charging bases. A component calculation does not establish procurement compliance, funding eligibility, or the full cost of a program.

Divide nonnegative bondAmount by positive bidAmount for bondFraction and multiply by 100 for bondPercent.

When to use this tool

Use Procurement Bid Bond Share when you need a narrow budget, contribution, or fee calculation from supplied amounts.

How to use the tool and how it works

  1. Enter bidAmount, bondAmount. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read bondFraction, bondPercent. Use the output convention below.

Divide nonnegative bondAmount by positive bidAmount for bondFraction and multiply by 100 for bondPercent.1

Input fieldMeaning and unitsAccepted input
bidAmountBid AmountRequired. Finite number; strictly above 0.
bondAmountBond AmountRequired. Finite number; minimum 0.
Output fieldInterpretationReturned shape
bondFractionBond FractionRequired. Finite number.
bondPercentBond PercentRequired. Finite number.
json
{
  "input": {
    "bidAmount": 100000,
    "bondAmount": 5000
  },
  "output": {
    "bondFraction": 0.05,
    "bondPercent": 5
  }
}

Limitations and assumptions

  • A bond can exceed the bid; procurement requirements, bond validity, and acceptable security are not assessed.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Reconcile the calculation with the approved budget, governing rules, and complete procurement or funding record.