Stope Tonnage Calculator

Reconcile actual moisture-corrected stope extraction weights versus independent delivered dry ledger, not volume×density predicted ore tonnage. Caller independently verifies units, applicability and matching conditions; no operational recipe, safety certification, causal efficacy or legal/resource classification is inferred.

Description

Wet extraction weights require matched dry fractions before comparing dry-material ledgers.

Wet extraction weights require matched dry fractions before comparing dry-material ledgers.1

This audit retains the delivered-minus-extracted discrepancy.

When to use Stope Tonnage Calculator

Use this tool to calculate or review the supplied observations under the stated rules. Match completed survey or ledger observations by block, segment or stage and confirm their units and boundaries.

How to use Stope Tonnage Calculator and understand its results

  1. Match completed survey or ledger observations by block, segment or stage and confirm their units and boundaries.
  2. Enter observedStopeWetTonnages, observedStopeDryFractions, observedIndependentDeliveredDryTonnes, using the field meanings and rules below, then run the tool.
  3. Read observedStopeDryTonnes, signedDeliveredMinusStopeDryTonnes. Inspect nested result fields where present, and review unknown records separately from known matches.
  4. Correct any reported input issue and run again. Before using a successful result, check the stated units, signs, reference scope and observation coverage.
Input fieldMeaningValue typeRequirement
observedStopeWetTonnagesObserved stope wet tonnageslist of numberRequired
observedStopeDryFractionsObserved stope dry fractionslist of numberRequired
observedIndependentDeliveredDryTonnesObserved independent delivered dry tonnesnumberRequired

Use aligned nonnegative wet tonnages and dry fractions [0,1], plus a nonnegative independent delivered dry total. Sum wet×dryFraction and subtract it from delivered dry tonnes.

dry=Σwet_i fraction_i; discrepancy=deliveredDry−dry

Use the matching field units and the exact boundary, ordering and reference rules above.

Output fieldMeaningValue type
observedStopeDryTonnesObserved stope dry tonnesnumber
signedDeliveredMinusStopeDryTonnesSigned delivered minus stope dry tonnes; preserve the subtraction order and sign defined in the mechanicsnumber
json
{
  "input": {
    "observedStopeWetTonnages": [
      10,
      20
    ],
    "observedStopeDryFractions": [
      0.8,
      0.9
    ],
    "observedIndependentDeliveredDryTonnes": 25
  },
  "output": {
    "observedStopeDryTonnes": 26,
    "signedDeliveredMinusStopeDryTonnes": -1
  }
}

Limitations and assumptions

Units, ledger boundaries, survey interpretation and model applicability must be independently established. These summaries do not assign reserve/resource classifications or establish support adequacy, ventilation safety or an operating setting.

Missing required fields, unknown fields, wrong types and violated rules return input issues. Numeric values and outputs must be finite. Lists and matrices must be dense, without missing cells. Numeric lists allow at most 10000 entries; ordinary string lists allow at most 128 strings of 128 UTF-16 units each; numeric matrices allow at most 128 rows and 128 columns, subject to narrower requirements above.

Alternative or Complementary methods

For a related step, use Waste Tonnage Calculator: Bank volume and matched dry bulk density give a dry-mass inventory for classified waste. For a complementary comparison, use Mining Dilution Percentage Calculator: Mining dilution on a dry-mass basis separates recovered ore and diluent after moisture corrections.

References

  1. Stope Tonnage Calculator — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies