Mining Dilution Percentage Calculator

Extract actual moisture-corrected mining dilution inventory, dry diluent/(ore+diluent), not forward assay mixing or assumed equal moisture. Caller independently verifies units, applicability and matching conditions; no operational recipe, safety certification, causal efficacy or legal/resource classification is inferred.

Description

Mining dilution on a dry-mass basis separates recovered ore and diluent after moisture corrections.

Mining dilution on a dry-mass basis separates recovered ore and diluent after moisture corrections.1

Ore and diluent can have different dry fractions.

When to use Mining Dilution Percentage Calculator

Use this tool to calculate or review the supplied observations under the stated rules. Match completed survey or ledger observations by block, segment or stage and confirm their units and boundaries.

How to use Mining Dilution Percentage Calculator and understand its results

  1. Match completed survey or ledger observations by block, segment or stage and confirm their units and boundaries.
  2. Enter observedRecoveredWetOreTonnes, observedOreDryFractions, observedWetDiluentTonnes, observedDiluentDryFractions, using the field meanings and rules below, then run the tool.
  3. Read observedDryDiluentFraction. Inspect nested result fields where present, and review unknown records separately from known matches.
  4. Correct any reported input issue and run again. Before using a successful result, check the stated units, signs, reference scope and observation coverage.
Input fieldMeaningValue typeRequirement
observedRecoveredWetOreTonnesObserved recovered wet ore tonneslist of numberRequired
observedOreDryFractionsObserved ore dry fractionslist of numberRequired
observedWetDiluentTonnesObserved wet diluent tonneslist of numberRequired
observedDiluentDryFractionsObserved diluent dry fractionslist of numberRequired

Use aligned nonnegative wet ore and diluent tonnes with respective dry fractions [0,1]. Sum wet×dryFraction separately, require their combined dry total>0 and return dry diluent/(dry ore+dry diluent).

dilution=Σ(diluentWet×diluentDryFraction)/[Σ(oreWet×oreDryFraction)+Σ(diluentWet×diluentDryFraction)]

Use the matching field units and the exact boundary, ordering and reference rules above.

Output fieldMeaningValue type
observedDryDiluentFractionObserved dry diluent fraction; dimensionless fraction, not a percentnumber
json
{
  "input": {
    "observedRecoveredWetOreTonnes": [
      10,
      20
    ],
    "observedOreDryFractions": [
      0.8,
      0.9
    ],
    "observedWetDiluentTonnes": [
      2,
      3
    ],
    "observedDiluentDryFractions": [
      0.5,
      1
    ]
  },
  "output": {
    "observedDryDiluentFraction": 0.13333333333333333
  }
}

Limitations and assumptions

Units, ledger boundaries, survey interpretation and model applicability must be independently established. These summaries do not assign reserve/resource classifications or establish support adequacy, ventilation safety or an operating setting.

Missing required fields, unknown fields, wrong types and violated rules return input issues. Numeric values and outputs must be finite. Lists and matrices must be dense, without missing cells. Numeric lists allow at most 10000 entries; ordinary string lists allow at most 128 strings of 128 UTF-16 units each; numeric matrices allow at most 128 rows and 128 columns, subject to narrower requirements above.

Alternative or Complementary methods

For a related step, use Dilution Volume Calculator: Excess extraction volume compares an as-mined cross-section with an independently established ore envelope. For a complementary comparison, use Longwall Dilution Calculator: Longwall dilution can separate roof and floor waste from undiluted coal.

References

  1. Mining Dilution Percentage Calculator — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies