Longwall Face Advance Rate

Infer face advance from matched recovered coal tonnage and geometry; assumes undiluted production.

Description

Face advance relates a recovered coal production mass to the volume swept by a longwall face.

Face advance relates a recovered coal production mass to the volume swept by a longwall face. Face length, seam height, density and recovery convert tonnes per day into metres per day.1

The tool returns faceAdvanceMetersPerDay. The computation uses supplied observations and parameters rather than acquiring measurements.

When to use Longwall Face Advance Rate

Use this for the following task: Infer face advance from matched recovered coal tonnage and geometry; assumes undiluted production. Prepare observations and calibration parameters on the same unit and reporting basis.

How to use Longwall Face Advance Rate and understand its results

  1. Prepare the measured quantities and supplied model parameters. Match the units and align paired lists before calculating.
  2. Enter dailyProducedTonnes, faceLengthM, seamHeightM, coalDensityTonnesPerM3, coalRecoveryFraction according to the field table, then run the tool.
  3. Read faceAdvanceMetersPerDay. Use the calculation below to interpret the selected mean or the model’s signs, units and comparison flags.
  4. Review the supplied assumptions and calibration before comparing or reporting the result.
Input fieldMeaningValue type and boundsRequirement
dailyProducedTonnesDaily produced tonnesnumberRequired
faceLengthMFace length mnumberRequired
seamHeightMSeam height mnumberRequired
coalDensityTonnesPerM3Coal density tonnes per m3numberRequired
coalRecoveryFractionCoal recovery fractionnumberRequired

Use nonnegative daily production, positive geometry and density, and a recovery fraction in (0,1]. Divide by recovered tonnes per metre of advance.

advance m/day = daily tonnes/(face length×seam height×density×recovery)

The symbols and boundary conditions refer to the supplied fields and the implementation described above.

Output fieldMeaningValue type
faceAdvanceMetersPerDayFace advance meters per daynumber
json
{
  "input": {
    "dailyProducedTonnes": 2400,
    "faceLengthM": 200,
    "seamHeightM": 2,
    "coalDensityTonnesPerM3": 1.5,
    "coalRecoveryFraction": 0.8
  },
  "output": {
    "faceAdvanceMetersPerDay": 5
  }
}

Limitations and assumptions

The mass must correspond to the supplied face and period and be undiluted recovered coal. No machine availability, cycle time or scheduling model is included.

Numerical inputs must be finite. Input-shape and calculation checks do not establish measurement quality or the validity of a supplied calibration.

Alternative or Complementary methods

Choose Metal Content when you need its operation: Calculate contained and recovered metal across dry-tonnage lots with grades in g/t; caller recovery fractions do not establish reserves or payable-metal terms. Choose Mine Life for the complementary operation: Schedule inventory against changing annual capacities and interpolate exhaustion year; insufficient horizons return censored errors.

Background reference: Surface Mining Technology: stripping ratios and pit layouts.

References

  1. Surface Mining Technology: stripping ratios and pit layouts — NPTEL, Indian Institute of Technology Kharagpur

Similar or alternative tools

  • Metal Content

    Calculate contained and recovered metal across dry-tonnage lots with grades in g/t; caller recovery fractions do not establish reserves or payable-metal terms.

  • Mine Life

    Schedule inventory against changing annual capacities and interpolate exhaustion year; insufficient horizons return censored errors.

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies