Skip to content

Main content

Rain Garden Freeboard Level Pair Tool

Measure signed freeboard between a rain-garden overflow and rim on a shared elevation datum.

Loading tool…

Description

Subtract overflowLevel from rimLevel for freeboard.

A site clearance is a signed difference between available space and an object or allowance. A supplied setback and assumed future envelope are separate from actual legal or environmental requirements.

Subtract overflowLevel from rimLevel for freeboard.

When to use this tool

Use Rain Garden Freeboard Level Pair when you need one explicit landscape clearance margin.

How to use the tool and how it works

  1. Enter overflowLevel, rimLevel. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read freeboard. Use the output convention below.

Subtract overflowLevel from rimLevel for freeboard.1

Input fieldMeaning and unitsAccepted input
overflowLevelOverflow LevelRequired. Finite number.
rimLevelRim LevelRequired. Finite number.
Output fieldInterpretationReturned shape
freeboardFreeboardRequired. Finite number.
json
{
  "input": {
    "overflowLevel": 99.7,
    "rimLevel": 100
  },
  "output": {
    "freeboard": 0.29999999999999716
  }
}

Limitations and assumptions

  • Levels require one datum and length unit; a negative result is retained and no storm storage, drainage capacity, or safe design allowance is established.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Verify current measurements, future growth, survey datums, and applicable design requirements for the site.

References

  1. Calculation and input contract: landscape-architecture/rain-garden-freeboard-level-pair — tool.io

Similar or alternative tools