Skip to content

Main content

Well Specific Capacity Drawdown Pair Tool

Calculate well specific capacity drawdown pair from explicit caller-supplied inputs.

Loading tool…

Description

Return pumpingRate/drawdown and its reciprocal.

Groundwater components relate hydraulic head, storage, porosity, and supplied flow parameters. A local equation uses a declared aquifer model; it does not establish that model from field observations.

Return pumpingRate/drawdown and its reciprocal.

When to use this tool

Use Well Specific Capacity Drawdown Pair when you need one explicit groundwater or soil-storage component.

How to use the tool and how it works

  1. Enter pumpingRate, drawdown. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read specificCapacity, drawdownPerRate. Use the output convention below.

Require positive pumpingRate and drawdown. Return pumpingRate/drawdown and its reciprocal.1

Input fieldMeaning and unitsAccepted input
pumpingRatePumping RateRequired. Finite number; strictly above 0.
drawdownDrawdownRequired. Finite number; strictly above 0.
Output fieldInterpretationReturned shape
specificCapacitySpecific CapacityRequired. Finite number.
drawdownPerRateDrawdown Per RateRequired. Finite number.
json
{
  "input": {
    "pumpingRate": 20,
    "drawdown": 4
  },
  "output": {
    "specificCapacity": 5,
    "drawdownPerRate": 0.2
  }
}

Limitations and assumptions

  • Units are discharge per head and head per discharge; this one observation does not estimate aquifer transmissivity, sustainable yield, or pumping safety.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Use suitable field measurements, aquifer assumptions, and a complete groundwater analysis for resource or safety decisions.

References

  1. Calculation and input contract: hydrology/well-specific-capacity-drawdown-pair — tool.io

Similar or alternative tools