Harvest System Productivity m³/PMH

Separate observed delivered-volume productivity per productive/scheduled machine hour and utilization; operational delays remain explicit and no machine capability guarantee.

Description

Productive and scheduled machine hours use different time denominators.

Productive and scheduled machine hours use different time denominators. Recorded delays reduce scheduled productivity and utilization without changing productive-time throughput.1

Separate observed delivered-volume productivity per productive/scheduled machine hour and utilization; operational delays remain explicit and no machine capability guarantee.

When to use Harvest System Productivity m³/PMH

Use this tool to separate observed delivered-volume productivity per productive/scheduled machine hour and utilization; operational delays remain explicit and no machine capability guarantee.

Gather the tree inventory, plot measurements or model parameters. Check diameter, area, time and moisture conventions; keep paired observations aligned.

How to use Harvest System Productivity m³/PMH and understand its results

  1. Gather the tree inventory, plot measurements or model parameters. Check diameter, area, time and moisture conventions; keep paired observations aligned.
  2. Enter deliveredVolumesM3, productiveMinutes, delayMinutes using the field table and calculation rules, then run the tool.
  3. Read productivityM3PerProductiveMachineHour, productivityM3PerScheduledMachineHour, machineUtilizationFraction. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
deliveredVolumesM3Delivered volumes m3list of numberRequired
productiveMinutesProductive minuteslist of numberRequired
delayMinutesDelay minuteslist of numberRequired

Pair nonnegative delivered m³ and delays with positive productive minutes per record. Pool volume and times, then return both m³/hour measures and productive/scheduled utilization.

Paired lists must be nonempty and have equal lengths.

productive productivity=60volume/productive minutes; scheduled productivity=60volume/(productive+delay minutes)

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
productivityM3PerProductiveMachineHourProductivity m3 per productive machine hournumber
productivityM3PerScheduledMachineHourProductivity m3 per scheduled machine hournumber
machineUtilizationFractionMachine utilization fractionnumber
json
{
  "input": {
    "deliveredVolumesM3": [
      10,
      20
    ],
    "productiveMinutes": [
      30,
      30
    ],
    "delayMinutes": [
      10,
      20
    ]
  },
  "output": {
    "productivityM3PerProductiveMachineHour": 30,
    "productivityM3PerScheduledMachineHour": 20,
    "machineUtilizationFraction": 0.6666666666666666
  }
}

Limitations and assumptions

The observations describe recorded work. Unrecorded delays and machine capability are not inferred.

Numeric inputs and returned numeric values must be finite; an unrepresentable returned value produces an error. Numeric lists are limited to 100,000 entries; the rules above may require smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Average Skidder Turn Cycle Time: Audit complete observed skidder phase cycles and actual payload throughput, not average phase duration or a generic travel-time estimate; no travel terrain, load capacity or operator safety inferred. For a complementary task, use Helicopter Log Payload Cycle Minute: Screen complete log-haul cycles from caller already-established available payload, rigging, green density and cycle duration; does not compute aircraft performance, approve lifts or certify external-load safety.

References

  1. Harvest System Productivity m³/PMH — tool.io

Similar or alternative tools

  • Average Skidder Turn Cycle Time

    Audit complete observed skidder phase cycles and actual payload throughput, not average phase duration or a generic travel-time estimate; no travel terrain, load capacity or operator safety inferred.

  • Helicopter Log Payload Cycle Minute

    Screen complete log-haul cycles from caller already-established available payload, rigging, green density and cycle duration; does not compute aircraft performance, approve lifts or certify external-load safety.

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies