Skip to content

Main content

Capacity Payment Availability Adjustment Term Tool

Calculate capacity payment availability adjustment term from explicit caller-supplied inputs.

Loading tool…

Description

availability = availableHours/contractedHours; payment = capacityKw*paymentPerKw*availability.

Energy contracts and credit accounts distinguish quantities accrued, used, available, curtailed, expired or qualified. A numeric balance applies an explicit convention; it does not establish which contractual or market rules actually apply.

availability = availableHours/contractedHours; payment = capacityKw*paymentPerKw*availability.

When to use this tool

Use Capacity Payment Availability Adjustment Term when reconciling a specified energy credit, allocation or settlement term.

How to use the tool and how it works

  1. Enter capacityKw, paymentPerKw, availableHours, contractedHours. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read availability, payment. Use the output convention below.

Require nonnegative capacityKw, positive contractedHours and availableHours in [0,contractedHours]. availability = availableHours/contractedHours; payment = capacityKw*paymentPerKw*availability.1

Input fieldMeaning and unitsAccepted input
capacityKwCapacity KwRequired. Finite number; minimum 0.
paymentPerKwPayment Per KwRequired. Finite number.
availableHoursAvailable Hours Unit: h.Required. Finite number; minimum 0.
contractedHoursContracted Hours Unit: h.Required. Finite number; strictly above 0.
Output fieldInterpretationReturned shape
availabilityAvailabilityRequired. Finite number.
paymentPaymentRequired. Finite number.
json
{
  "input": {
    "capacityKw": 100,
    "paymentPerKw": 20,
    "availableHours": 90,
    "contractedHours": 100
  },
  "output": {
    "availability": 0.9,
    "payment": 1800
  }
}

Limitations and assumptions

  • paymentPerKw is the full contracted-period currency/kW rate. Availability is a simple hour fraction; contractual tests, penalties and actual payment eligibility are omitted.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Review actual program rules, contract terms and dated records before treating a calculated balance or payment as due.

References

  1. Calculation and input contract: energy-economics/capacity-payment-availability-adjustment-term — tool.io

Similar or alternative tools