Description
Measure a payment certification date's signed gap from submission.
Construction records combine revisions, dates, dimensions, rental periods, claims and financial balances. Revision numbers need not be consecutive, calendar offsets differ from business days, and recoverable length can depend on a strict cutoff. A supplied approval or readiness label is a record assertion rather than an engineering inspection or contractual determination.
Measure a payment certification date's signed gap from submission.
When to use this tool
Use Subcontract Payment Certification Lag when you already have submissionDate, certificationDate and need to measure a payment certification date's signed gap from submission.
How to use the tool and how it works
- Enter submissionDate, certificationDate. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read signedCalendarDays. Use the output convention below.
Parse real UTC dates; return certification-submission in calendar days.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| submissionDate | Submission Date | Required. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted. |
| certificationDate | Certification Date | Required. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| signedCalendarDays | Signed Calendar Days | Required. Safe integer. |
{
"input": {
"submissionDate": "2026-10-28",
"certificationDate": "2026-11-01"
},
"output": {
"signedCalendarDays": 4
}
} Limitations and assumptions
- Negative gaps are retained. No submission, certification, payment entitlement, contract deadline or legal compliance is verified.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
Alternative or Complementary methods
Check controlled drawings, site measurements, schedules, approvals and the complete contract. Use the appropriate engineering assessment and actual billing or claim terms when a local scalar calculation or date comparison cannot establish suitability or entitlement.
References
Similar or alternative tools
- Site Punch Item Age Day Count
Count calendar days since a supplied punch-item raised date.
- Shop Drawing Review Round Age
Measure a supplied drawing-review round's signed age.