Shop Drawing Review Round Age

Calculate signed calendar age of one explicit shop-drawing review round without selecting turnaround targets.

Loading tool…

Description

Measure a supplied drawing-review round's signed age.

Construction records combine revisions, dates, dimensions, rental periods, claims and financial balances. Revision numbers need not be consecutive, calendar offsets differ from business days, and recoverable length can depend on a strict cutoff. A supplied approval or readiness label is a record assertion rather than an engineering inspection or contractual determination.

Measure a supplied drawing-review round's signed age.

When to use this tool

Use Shop Drawing Review Round Age when you already have roundSubmissionDate, evaluationDate and need to measure a supplied drawing-review round's signed age.

How to use the tool and how it works

  1. Enter roundSubmissionDate, evaluationDate. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read signedCalendarDays. Use the output convention below.

Parse real UTC dates; return evaluationDate-roundSubmissionDate in calendar days.1

Input fieldMeaning and unitsAccepted input
roundSubmissionDateRound Submission DateRequired. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted.
evaluationDateEvaluation DateRequired. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted.
Output fieldInterpretationReturned shape
signedCalendarDaysSigned Calendar DaysRequired. Safe integer.
json
{
  "input": {
    "roundSubmissionDate": "2026-10-28",
    "evaluationDate": "2026-11-01"
  },
  "output": {
    "signedCalendarDays": 4
  }
}

Limitations and assumptions

  • Negative gaps are retained. No document, review completion, revision validity or contractually appropriate turnaround is verified.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.

Alternative or Complementary methods

Check controlled drawings, site measurements, schedules, approvals and the complete contract. Use the appropriate engineering assessment and actual billing or claim terms when a local scalar calculation or date comparison cannot establish suitability or entitlement.

References

  1. Calculation and input contract: construction-management/shop-drawing-review-round-age — tool.io