Skip to content

Main content

Contaminant Mass Closure Gap Tool

Supplied contaminant-mass ledger residual without a remediation efficacy model.

Loading tool…

Description

Return contaminant mass closure without a sampled-removal term.

Environmental-remediation bookkeeping uses explicit water, soil, dry-mass, concentration and sampling bases. A local mass residual, censored-result bound or supplied target margin does not identify a removal mechanism, establish representativeness or determine an environmentally acceptable contaminant level.

Return contaminant mass closure without a sampled-removal term.

When to use this tool

Use Contaminant Mass Closure Gap when checking the stated remediation measurement, mass/volume balance or support convention.

How to use the tool and how it works

  1. Enter initialMass, inflowMass, outflowMass, measuredFinal. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read expectedFinal, residual. Use the output convention below.

Return contaminant mass closure without a sampled-removal term. Require nonnegative masses, outflow <= initial+inflow and measuredFinal >= 0; expectedFinal = initial+inflow-outflow, residual = measured-expected.1

Input fieldMeaning and unitsAccepted input
initialMassInitial MassRequired. Finite number; minimum 0.
inflowMassInflow MassRequired. Finite number; minimum 0.
outflowMassOutflow MassRequired. Finite number; minimum 0.
measuredFinalMeasured FinalRequired. Finite number; minimum 0.
Output fieldInterpretationReturned shape
expectedFinalExpected FinalRequired. Finite number.
residualSigned difference in the direction stated above, with matching units.Required. Finite number.
json
{
  "input": {
    "initialMass": 100,
    "inflowMass": 10,
    "outflowMass": 30,
    "measuredFinal": 75
  },
  "output": {
    "expectedFinal": 80,
    "residual": -5
  }
}

Limitations and assumptions

  • Use one period and mass unit; no actual transformation, reaction, leakage or successful remediation is inferred.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Use verified sampling and analytical data, consistent material/unit bases and a complete transport or treatment model; involve qualified environmental professionals for practical or regulatory decisions.

References

  1. Calculation and input contract: bioremediation/contaminant-mass-closure-gap — tool.io

Similar or alternative tools