Description
Return station-place capacity and participant gap.
Studio-class budgets allocate supplied time, turns, places and materials. Reserved quantities and shared work affect the reporting denominator, and a negative remainder or undefined per-person amount is useful bookkeeping information. These arithmetic checks do not assess learning quality, accessibility or whether a real class can safely perform an activity.
Return station-place capacity and participant gap.
When to use this tool
Use Activity Station Capacity Gap when checking the stated studio allocation, participation, capacity or time budget.
How to use the tool and how it works
- Enter places, participants. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read capacity, gap. Use the output convention below.
Return station-place capacity and participant gap. Require nonnegative whole places/participants; capacity = sum(places), gap = capacity-participants.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| places | Places | Required. Array of safe integer; minimum 0; maximum items 256. |
| participants | Participants | Required. Safe integer; minimum 0. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| capacity | Capacity | Required. Safe integer. |
| gap | Gap | Required. Safe integer. |
{
"input": {
"places": [
4,
6
],
"participants": 12
},
"output": {
"capacity": 10,
"gap": -2
}
} Limitations and assumptions
- Negative gap reports shortfall; actual station compatibility, scheduling, accessibility and safe occupancy are not established.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Review the actual class plan, learner needs, usable resources and supervision requirements before organizing an activity.
References
Similar or alternative tools
- Portfolio Spread Image Count Capacity
Return portfolio image-slot capacity and signed remainder.
- Studio Task Station Time Share Tool
Calculate studio task station time share from explicit caller-supplied inputs.