Foliage Wire Raise Height Per Pass Calculator
Audit actual foliage-wire raise pass chronology, signed height change and caller increment limit; not final level gaps, inferred shoot growth or raising/pruning recommendation.
Description
Wire-raising records describe changes across dated passes.
Wire-raising records describe changes across dated passes. Negative changes and elapsed time affect rate interpretation.1
Enter aligned nonnegative heights and at least two strictly increasing nonnegative day ordinals, plus nonnegative increment maximum. Return increments/rates and later zero-based pass indices strictly above the limit.
When to use Foliage Wire Raise Height Per Pass Calculator
Use Foliage Wire Raise Height Per Pass Calculator when you need to evaluate the supplied records under the calculation and evidence rules below. Only positive exceedance is flagged; lowering remains signed. No growth or raising schedule is prescribed.
Prepare the measured vineyard records, aligned lists and independently verified local limits or catalog requested. Keep units, crop stages and observation periods consistent.
How to use Foliage Wire Raise Height Per Pass Calculator and understand its results
- Prepare the measured vineyard records, aligned lists and independently verified local limits or catalog requested. Keep units, crop stages and observation periods consistent.
- Enter observedWireRaiseHeightsM, observedWireRaiseDayOrdinals, callerMaximumRaiseIncrementM using the field table and calculation rules, then run the tool.
- Read observedRaiseIncrementsM, observedRaiseRatesMDay, raisePassesAboveCallerIncrementIndices. The explanation below defines the units, signs, ordering and any flags or placeholder values.
- If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
| Input field | Meaning | Value type; see rules below | Requirement |
|---|---|---|---|
| observedWireRaiseHeightsM | Observed wire raise heights m | list of number | Required |
| observedWireRaiseDayOrdinals | Observed wire raise day ordinals | list of number | Required |
| callerMaximumRaiseIncrementM | Caller maximum raise increment m | number | Required |
Enter aligned nonnegative heights and at least two strictly increasing nonnegative day ordinals, plus nonnegative increment maximum. Return increments/rates and later zero-based pass indices strictly above the limit.
increment=nextHeight−priorHeight; rate=increment/dayDifference Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.
| Output field | Meaning | Value type |
|---|---|---|
| observedRaiseIncrementsM | Observed raise increments m | list of number |
| observedRaiseRatesMDay | Observed raise rates m day | list of number |
| raisePassesAboveCallerIncrementIndices | Raise passes above caller increment indices | list of number |
{
"input": {
"observedWireRaiseHeightsM": [
0.5,
0.8,
1.2
],
"observedWireRaiseDayOrdinals": [
0,
3,
7
],
"callerMaximumRaiseIncrementM": 0.35
},
"output": {
"observedRaiseIncrementsM": [
0.30000000000000004,
0.3999999999999999
],
"observedRaiseRatesMDay": [
0.10000000000000002,
0.09999999999999998
],
"raisePassesAboveCallerIncrementIndices": [
2
]
}
} Limitations and assumptions
Only positive exceedance is flagged; lowering remains signed. No growth or raising schedule is prescribed.
Numeric inputs, where present, must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Numeric lists are limited to 10,000 entries; string lists to 128 strings of at most 128 characters each. The rules above may impose smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.
Alternative or Complementary methods
Use Tucking In Catch Wire Passes Counter: Tucking completion is a row-by-pass record. Pass counts describe recorded work rather than retained-shoot condition. For a complementary task, use Catch Wire Levels Spacing Calculator: Catch-wire vertical spacing is measured between ordered levels. A chosen gap band can identify deviations from a local plan.
References
Similar or alternative tools
- Tucking In Catch Wire Passes Counter
Tucking completion is a row-by-pass record. Pass counts describe recorded work rather than retained-shoot condition.
- Catch Wire Levels Spacing Calculator
Catch-wire vertical spacing is measured between ordered levels. A chosen gap band can identify deviations from a local plan.