Crush Pad Throughput Tonnes Day Calculator

Audit actual serial crush-pad stage daily capacities and all tied bottlenecks from measured rates/scheduled productive hours; buffers, startup dependencies, batch yields and queuing excluded, no guaranteed output.

Description

Serial crush-pad capacity is constrained by its lowest modeled station capacity.

Serial crush-pad capacity is constrained by its lowest modeled station capacity. Equal limiting capacities create multiple bottlenecks.1

Enter aligned nonempty unique station IDs, positive rates, hours 0–24 and nonnegative incoming tonnes. Return station/line capacities, all tied bottleneck IDs and clipped incoming excess.

When to use Crush Pad Throughput Tonnes Day Calculator

Use Crush Pad Throughput Tonnes Day Calculator when you need to evaluate the supplied records under the calculation and evidence rules below. No buffers, batch yield, start-up dependencies or queuing are modeled.

Prepare the measured vineyard records, aligned lists and independently verified local limits or catalog requested. Keep units, crop stages and observation periods consistent.

How to use Crush Pad Throughput Tonnes Day Calculator and understand its results

  1. Prepare the measured vineyard records, aligned lists and independently verified local limits or catalog requested. Keep units, crop stages and observation periods consistent.
  2. Enter crushStationIds, measuredStationTonnesPerProductiveHour, callerDailyProductiveHours, callerDailyIncomingTonnes using the field table and calculation rules, then run the tool.
  3. Read modeledDailyStationCapacityTonnes, modeledDailySerialLineCapacityTonnes, bottleneckStationIds, incomingTonnesAboveModeledLineBudget. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
crushStationIdsCrush station idslist of stringRequired
measuredStationTonnesPerProductiveHourMeasured station tonnes per productive hourlist of numberRequired
callerDailyProductiveHoursCaller daily productive hourslist of numberRequired
callerDailyIncomingTonnesCaller daily incoming tonnesnumberRequired

Enter aligned nonempty unique station IDs, positive rates, hours 0–24 and nonnegative incoming tonnes. Return station/line capacities, all tied bottleneck IDs and clipped incoming excess.

stationDaily=rate×productiveHours; line=min(stationDaily)

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
modeledDailyStationCapacityTonnesModeled daily station capacity tonneslist of number
modeledDailySerialLineCapacityTonnesModeled daily serial line capacity tonnesnumber
bottleneckStationIdsBottleneck station idslist of string
incomingTonnesAboveModeledLineBudgetIncoming tonnes above modeled line budgetnumber
json
{
  "input": {
    "crushStationIds": [
      "receive",
      "destem",
      "press"
    ],
    "measuredStationTonnesPerProductiveHour": [
      10,
      8,
      5
    ],
    "callerDailyProductiveHours": [
      8,
      6,
      8
    ],
    "callerDailyIncomingTonnes": 50
  },
  "output": {
    "modeledDailyStationCapacityTonnes": [
      80,
      48,
      40
    ],
    "modeledDailySerialLineCapacityTonnes": 40,
    "bottleneckStationIds": [
      "press"
    ],
    "incomingTonnesAboveModeledLineBudget": 10
  }
}

Limitations and assumptions

No buffers, batch yield, start-up dependencies or queuing are modeled.

Numeric inputs, where present, must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Numeric lists are limited to 10,000 entries; string lists to 128 strings of at most 128 characters each. The rules above may impose smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Harvester Throughput Hectares Hour Calculator: Harvester throughput depends on whether hours include downtime. Unequal sessions should be pooled by area and exposure. For a complementary task, use Gondola Loads Per Hectare Calculator: Whole gondola loads depend on usable payload and whether blocks may share final loads. Capacity rounding affects unused space.

References

  1. Crush Pad Throughput Tonnes Day Calculator — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies