Skip to content

Main content

City Garden Sun Window Duration

Subtract explicit same-timeline sun-window endpoints in minutes without predicting sunlight.

Loading tool…

Description

Measure the signed duration of a recorded garden sun window.

City-garden planning combines nominal container geometry, route lengths, water masses, access sides and shared-resource accounting. A litre quantity becomes mass only with a density, while reach depends on the declared accessible sides. Simple margins and shares organize supplied measurements; material behavior, structural capacity and individual access needs require separate assessment.

Measure the signed duration of a recorded garden sun window.

When to use this tool

Use City Garden Sun Window Duration when you already have sunWindowStartMinutes, sunWindowEndMinutes and need to measure the signed duration of a recorded garden sun window.

How to use the tool and how it works

  1. Enter sunWindowStartMinutes, sunWindowEndMinutes. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read signedGap. Use the output convention below.

Return sunWindowEndMinutes-sunWindowStartMinutes on one supplied time coordinate.1

Input fieldMeaning and unitsAccepted input
sunWindowStartMinutesSun Window Start MinutesRequired. Finite number.
sunWindowEndMinutesSun Window End MinutesRequired. Finite number.
Output fieldInterpretationReturned shape
signedGapSupplied end-minus-start minutes; no overnight rollover is applied.Required. Finite number.
json
{
  "input": {
    "sunWindowStartMinutes": 12,
    "sunWindowEndMinutes": 17
  },
  "output": {
    "signedGap": 5
  }
}

Limitations and assumptions

  • Negative durations are retained; no overnight correction, sun-path calculation, shading model or crop-light requirement is inferred.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Measure the actual bed, container and access routes before applying nominal dimensions. For roof loading or water delivery, use the full support or hydraulic calculation; reconcile volunteer and harvest records over one common accounting period.

References

  1. Calculation and input contract: urban-agriculture/city-garden-sun-window-duration — tool.io

Similar or alternative tools