Clean-Energy Credit

Calculate a clean-energy credit using caller-supplied rate and cap.

Description

A clean-energy credit scenario applies a rate to supplied eligible cost and caps the result.

A clean-energy credit scenario applies a rate to supplied eligible cost and caps the result. The arithmetic cannot determine project qualification.1

Calculate a clean-energy credit using caller-supplied rate and cap.

When to use Clean-Energy Credit

Use this tool to calculate a clean-energy credit using caller-supplied rate and cap.

Choose the specific arithmetic or checklist scenario and establish its input amounts, dates, rates and criteria from the applicable records. Keep currencies, periods and jurisdictions consistent; review the tool-specific assumptions before interpreting the result.

How to use Clean-Energy Credit and understand its results

  1. Choose the specific arithmetic or checklist scenario and establish its input amounts, dates, rates and criteria from the applicable records. Keep currencies, periods and jurisdictions consistent; review the tool-specific assumptions before interpreting the result.
  2. Enter eligibleProjectCost, creditRatePercent, creditCap using the field table and calculation rules, then run the tool.
  3. Read uncappedCredit, creditAmount. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
eligibleProjectCostEligible project cost (currency)number; minimum: 0Required
creditRatePercentCredit rate (%)number; minimum: 0Required
creditCapCredit cap (currency)number; minimum: 0Required

Enter nonnegative cost, rate and maximum. Read the uncapped estimate and capped credit.

raw=eligibleCost×creditRate/100; credit=min(raw,maximum)

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
uncappedCreditUncapped credit (currency)number; minimum: 0
creditAmountCredit amount (currency)number; minimum: 0
json
{
  "input": {
    "eligibleProjectCost": 30000,
    "creditRatePercent": 30,
    "creditCap": 7500
  },
  "output": {
    "uncappedCredit": 9000,
    "creditAmount": 7500
  }
}

Limitations and assumptions

Technology, placed-in-service date, bonus criteria, phaseouts and entitlement must be established independently.

Numeric inputs must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Home-Improvement Credit Cap: Apply caller-supplied category and annual caps to home-improvement costs. For a complementary task, use New-Markets Credit Schedule: Generate the seven-year 5/5/5/6/6/6/6 percent credit schedule for a supplied investment.

References

  1. Clean-Energy Credit — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies