Skip to content

Main content

Nutrient Budget Recycled Input Term Tool

Calculate nutrient budget recycled input term from explicit caller-supplied inputs.

Loading tool…

Description

Return surplus=externalInput+recycledInput-output-losses and recycledShare=recycledInput/(externalInput+recycledInput).

A farm or garden budget depends on a common area, quantity, observation period, and system boundary. Recovery, exclusions, overlap, and allocation change how a share is calculated. Supplied accounting or geometry terms remain separate from measured crop performance and verified environmental outcomes.

Return surplus=externalInput+recycledInput-output-losses and recycledShare=recycledInput/(externalInput+recycledInput).

When to use this tool

Use Nutrient Budget Recycled Input Term when you need a clearly bounded area, material, resource, energy, or allocation term for supplied garden or farm records.

How to use the tool and how it works

  1. Enter externalInput, recycledInput, output, losses. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read surplus, recycledShare. Use the output convention below.

Return surplus=externalInput+recycledInput-output-losses and recycledShare=recycledInput/(externalInput+recycledInput). Require nonnegative quantities with positive combined inputs.1

Input fieldMeaning and unitsAccepted input
externalInputExternal InputRequired. Finite number; minimum 0.
recycledInputRecycled InputRequired. Finite number; minimum 0.
outputOutputRequired. Finite number; minimum 0.
lossesLossesRequired. Finite number; minimum 0.
Output fieldInterpretationReturned shape
surplusSurplusRequired. Finite number.
recycledShareRecycled ShareRequired. Finite number.
json
{
  "input": {
    "externalInput": 60,
    "recycledInput": 40,
    "output": 70,
    "losses": 10
  },
  "output": {
    "surplus": 20,
    "recycledShare": 0.4
  }
}

Limitations and assumptions

  • Use one nutrient mass basis and period. Surplus can be negative; this term does not infer fertilizer requirements, soil nutrient availability, losses, or environmental performance.
  • The field tables state structural bounds; the mechanics also specify cross-field constraints. Malformed inputs and unsupported domains cause errors. A successful false flag, empty branch value, or zero placeholder has the meaning stated above and is distinct from an input error.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Signed zero is exported as zero.

Alternative or Complementary methods

Verify the system boundary, units, and source records before combining this term into a resource or environmental report. Physical design and crop-performance questions require appropriate measurements and a broader model.

References

  1. Calculation and input contract: sustainable-agriculture/nutrient-budget-recycled-input-term — tool.io

Similar or alternative tools