Description
Calculate dryMass=wetMass*(1-moistureFraction) and referenceMass=dryMass/(1-referenceMoisture).
A logistics record separates ordered, reserved, dispatched, received, lost, and available quantities. It can also distinguish volume, mass, packaging, and cost bases. A balance or ratio checks supplied records and assumptions without verifying physical inventory, a contract, or safe loading.
Calculate dryMass=wetMass*(1-moistureFraction) and referenceMass=dryMass/(1-referenceMoisture).
When to use this tool
Use Supplier Moisture Adjusted Weight Term when you need the particular supplied count, loading-budget, timing, or cost term in a logistics record.
How to use the tool and how it works
- Enter wetMass, moistureFraction, referenceMoisture. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read dryMass, referenceMass. Use the output convention below.
Calculate dryMass=wetMass*(1-moistureFraction) and referenceMass=dryMass/(1-referenceMoisture). Require nonnegative wet mass, moisture fraction within zero through one, and reference moisture below one.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| wetMass | Wet Mass | Required. Finite number; minimum 0. |
| moistureFraction | Moisture Fraction | Required. Finite number; minimum 0; maximum 1. |
| referenceMoisture | Reference Moisture | Required. Finite number; minimum 0; strictly below 1. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| dryMass | Dry Mass | Required. Finite number. |
| referenceMass | Reference Mass | Required. Finite number. |
{
"input": {
"wetMass": 100,
"moistureFraction": 0.2,
"referenceMoisture": 0.1
},
"output": {
"dryMass": 80,
"referenceMass": 88.88888888888889
}
} Limitations and assumptions
- Both moisture values are wet-basis fractions, not percentage numerals. The conversion assumes compatible material mass bases and does not measure moisture, quality, or commercial acceptance.
- The field tables state structural bounds; the mechanics also specify cross-field constraints. Malformed inputs and unsupported domains cause errors. A successful false flag, empty branch value, or zero placeholder has the meaning stated above and is distinct from an input error.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Signed zero is exported as zero.
Alternative or Complementary methods
Check the original stock, shipment, measurement, and contract records before acting on a balance. A full packing, routing, procurement, or load assessment may require more than the returned term.
References
Similar or alternative tools
- Shipment Fill Weight Remainder
Supplied shipment weight ledger retaining over-capacity residuals without transport-safety approval.
- Supplier Delivery Lateness Sign
Return lateness=deliveredAt-promisedAt and its sign, and test inclusive membership from promisedAt-allowedEarly through promisedAt+allowedLate.