Depth Below Entrance Datum Converter

Signed station depth below actual common-datum entrance; negative means above entrance, not absolute cave-depth record.

Description

Depth below an entrance datum subtracts station elevation from entrance elevation.

Depth below an entrance datum subtracts station elevation from entrance elevation.1

A station above the entrance produces a negative depth under this signed convention.

When to use Depth Below Entrance Datum Converter

Use this tool to obtain signedDepthBelowEntranceMeters from the supplied records using the stated calculation. Establish the survey or observation scope, reference frame, units and independently applicable calibration or qualified plan.

How to use Depth Below Entrance Datum Converter and understand its results

  1. Establish the survey or observation scope, reference frame, units and independently applicable calibration or qualified plan.
  2. Enter actualEntranceDatumElevationMeters, actualStationElevationMeters, using the field meanings and rules below, then run the tool.
  3. Read result.signedDepthBelowEntranceMeters. Use the units and sign conventions below, and review any unknown records separately.
  4. Correct any reported input issue and run again. Before using a successful result, check the stated units, signs, reference scope and observation coverage.
Input fieldMeaningValue typeRequirement
actualEntranceDatumElevationMetersActual entrance datum elevation metersnumberRequired
actualStationElevationMetersActual station elevation metersnumberRequired

Enter two finite elevations in metres on a common datum. Subtract station elevation from entrance elevation; signed inputs and a negative result are accepted.

depthBelowEntranceMeters=entranceElevation−stationElevation

Use the matching field units and the exact boundary, ordering and reference rules above.

Output fieldMeaningValue type
resultQualified observed calculation or explicit referenceobject
result.signedDepthBelowEntranceMetersSigned Depth Below Entrance Meters; preserve the subtraction order and sign defined in the mechanicsnumber
json
{
  "input": {
    "actualEntranceDatumElevationMeters": 10,
    "actualStationElevationMeters": 3
  },
  "output": {
    "result": {
      "signedDepthBelowEntranceMeters": 7
    }
  }
}

Limitations and assumptions

The actual observation coverage, calibration and qualified plan determine applicability. A numerical result does not establish survey accuracy, route suitability, atmosphere conditions or equipment adequacy beyond the declared comparison.

Missing required fields, unknown fields, wrong types and violated rules return input issues. Numeric values and outputs must be finite. Extremely large composite outputs are rejected.

Alternative or Complementary methods

For a related step, use Grid Reference to Survey Coordinate Converter: A grid reference belongs to a coordinate system, zone, datum and origin. For a complementary comparison, use Survey Shot 3D Coordinate Calculator: A cave survey shot relates a measured distance, azimuth and inclination to a Cartesian displacement.

References

  1. Depth Below Entrance Datum Converter — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies