Skip to content

Main content

Proportional Rebate Fixed Credit Order Tool

Calculate proportional rebate fixed credit order from explicit caller-supplied inputs.

Loading tool…

Description

Compare rebateThenCredit=base*(1-rebate)-credit with creditThenRebate=(base-credit)*(1-rebate), returning gap=second-first.

A ratio compares quantities under a stated numerator and denominator. Fractions, percentage numerals, and percentage-point changes use different conventions, and changing a part can also change its whole. Unit consistency, zero denominators, rounding, and the order of adjustments determine the result.

Compare rebateThenCredit=base*(1-rebate)-credit with creditThenRebate=(base-credit)*(1-rebate), returning gap=second-first.

When to use this tool

Use Proportional Rebate Fixed Credit Order when you need this specific ratio, allocation, transformation, interval, or adjustment-order calculation with an explicit base.

How to use the tool and how it works

  1. Enter base, rebate, credit. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read rebateThenCredit, creditThenRebate, gap. Use the output convention below.

Compare rebateThenCredit=base*(1-rebate)-credit with creditThenRebate=(base-credit)*(1-rebate), returning gap=second-first. Require rebate within zero through one while retaining signed base and credit.1

Input fieldMeaning and unitsAccepted input
baseBaseRequired. Finite number.
rebateRebateRequired. Finite number; minimum 0; maximum 1.
creditCreditRequired. Finite number.
Output fieldInterpretationReturned shape
rebateThenCreditRebate Then CreditRequired. Finite number.
creditThenRebateCredit Then RebateRequired. Finite number.
gapGapRequired. Finite number.
json
{
  "input": {
    "base": 100,
    "rebate": 0.2,
    "credit": 10
  },
  "output": {
    "rebateThenCredit": 70,
    "creditThenRebate": 72,
    "gap": 2
  }
}

Limitations and assumptions

  • Ordering changes which amount receives the percentage reduction. The tool does not determine contract terms, taxes, eligibility, payment obligations, or currency rounding.
  • The field tables state structural bounds; the mechanics also specify cross-field constraints. Malformed inputs and unsupported domains cause errors. A successful false flag, empty branch value, or zero placeholder has the meaning stated above and is distinct from an input error.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Signed zero is exported as zero.

Alternative or Complementary methods

Check numerator, denominator, units, and adjustment order before comparing results. Use a complete allocation or physical mixture model when a single arithmetic term leaves relevant constraints unspecified.

References

  1. Calculation and input contract: proportions/proportional-rebate-fixed-credit-order — tool.io

Similar or alternative tools