Description
Subtract holidayDays from workDays, multiply by hoursPerDay, and subtract otherUnavailableHours for availableHours.
Capacity accounting compares available supply with commitments, reservations, or demand. Negative residuals can expose overload while zero capacity requires a distinct undefined utilization state.
Subtract holidayDays from workDays, multiply by hoursPerDay, and subtract otherUnavailableHours for availableHours.
When to use this tool
Use Workload Availability Holiday Adjustment when you need a transparent resource or workload capacity term.
How to use the tool and how it works
- Enter workDays, hoursPerDay, holidayDays, otherUnavailableHours, assignedHours. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read availableHours, remainingHours. Use the output convention below.
Subtract holidayDays from workDays, multiply by hoursPerDay, and subtract otherUnavailableHours for availableHours. Subtract assignedHours for remainingHours.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| workDays | Work Days | Required. Safe integer; minimum 0. |
| hoursPerDay | Hours Per Day | Required. Finite number; minimum 0. |
| holidayDays | Holiday Days | Required. Finite number; minimum 0. |
| otherUnavailableHours | Other Unavailable Hours | Required. Finite number; minimum 0. |
| assignedHours | Assigned Hours | Required. Finite number; minimum 0. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| availableHours | Available Hours | Required. Finite number. |
| remainingHours | Remaining Hours | Required. Finite number. |
{
"input": {
"workDays": 20,
"hoursPerDay": 8,
"holidayDays": 2,
"otherUnavailableHours": 4,
"assignedHours": 130
},
"output": {
"availableHours": 140,
"remainingHours": 10
}
} Limitations and assumptions
- Unavailable hours cannot exceed the post-holiday capacity; remaining hours can be negative and no holiday calendar or labor rule is inferred.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Validate calendars, skill constraints, and concurrent demand with the actual resource plan.
References
Similar or alternative tools
- Capacity Buffer Share
Subtract committed from positive capacity for uncommitted, then subtract reserved for freeAfterReserve.
- Resource Utilization Billable Exclusion
Subtract excludedHours from paidHours for positive eligibleHours and divide billableHours by it.