Skip to content

Main content

Approval Substitute Role Date Flag

Combine an explicit role-match flag with an inclusive substitute-role date record without granting approval authority.

Loading tool…

Description

Check a recorded substitute role within a closed date interval.

Project records separate planned effort, recorded time, forecast assumptions, resource buffers and role authority. A probability-weighted impact is one scenario term, and a calendar-day shift is not a business-calendar calculation. Local progress and workload shares need consistent scope and periods before broader interpretation.

Check a recorded substitute role within a closed date interval.

When to use this tool

Use Approval Substitute Role Date Flag when you already have asOfDate, substituteStartDate, substituteEndDate, roleMatches and need to check a recorded substitute role within a closed date interval.

How to use the tool and how it works

  1. Enter asOfDate, substituteStartDate, substituteEndDate, roleMatches. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read withinRecordedSubstitution. Inspect withinRecordedSubstitution before interpreting the associated values.

Parse real UTC dates and require end>=start; return roleMatches && start<=asOf<=end.1

Input fieldMeaning and unitsAccepted input
asOfDateAs Of DateRequired. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted.
substituteStartDateSubstitute Start DateRequired. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted.
substituteEndDateSubstitute End DateRequired. Text; maximum UTF-16 length 8192. Real proleptic Gregorian YYYY-MM-DD; four-digit years 0000-9999 accepted.
roleMatchesRole MatchesRequired. Boolean.
Output fieldInterpretationReturned shape
withinRecordedSubstitutionRole match plus a closed date interval including both start and end; no authority is authenticated.Required. Boolean.
json
{
  "input": {
    "asOfDate": "2026-11-01",
    "substituteStartDate": "2026-10-01",
    "substituteEndDate": "2026-12-01",
    "roleMatches": true
  },
  "output": {
    "withinRecordedSubstitution": true
  }
}

Limitations and assumptions

  • Both dates are included; the role flag and dates do not establish actual delegated authority or approval validity.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.

Alternative or Complementary methods

Reconcile the complete plan, resource calendar, costs and action history for an operational question. Use the actual business calendar or delegated-role documentation when required, rather than treating one supplied offset or Boolean as that full workflow.

References

  1. Calculation and input contract: management/approval-substitute-role-date-flag — tool.io

Similar or alternative tools