Builder's Risk Soft-Cost Check

Compare caller-supplied expected and observed records for builder's risk soft-cost check.

Description

Builder’s-risk soft-cost coverage can be inventoried by named requested and included cost categories.

Builder’s-risk soft-cost coverage can be inventoried by named requested and included cost categories. The percentage measures requested categories matched.1

Compare caller-supplied expected and observed records for builder's risk soft-cost check.

When to use Builder's Risk Soft-Cost Check

Use this tool to compare caller-supplied expected and observed records for builder's risk soft-cost check.

Prepare the supplied policy terms, dates, assumptions or recorded indicators requested. Keep monetary amounts on one currency basis and select the applicable thresholds separately.

How to use Builder's Risk Soft-Cost Check and understand its results

  1. Prepare the supplied policy terms, dates, assumptions or recorded indicators requested. Keep monetary amounts on one currency basis and select the applicable thresholds separately.
  2. Enter requestedSoftCosts, includedSoftCosts using the field table and calculation rules, then run the tool.
  3. Read coveragePercent, matched, missing, unexpected. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
requestedSoftCostsRequested soft costslist of stringRequired
includedSoftCostsIncluded soft costslist of stringRequired

Supply requested soft-cost labels first and included labels second. Trim and lowercase labels; reject blanks and require a nonempty first list. Deduplicate by normalized key, retaining first position and last trimmed spelling. Return matches/missing first-list labels, unexpected second-list labels, and percentage; the second list may be empty.

coverage%=100×matchedUnique/requiredUnique

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
coveragePercentCoverage (%)number; minimum: 0; maximum: 100
matchedMatched itemslist of string
missingMissing itemslist of string
unexpectedUnexpected itemslist of string
json
{
  "input": {
    "requestedSoftCosts": [
      "design fees",
      "permits",
      "interest"
    ],
    "includedSoftCosts": [
      "design fees",
      "permits"
    ]
  },
  "output": {
    "coveragePercent": 66.66666666666666,
    "matched": [
      "design fees",
      "permits"
    ],
    "missing": [
      "interest"
    ],
    "unexpected": []
  }
}

Limitations and assumptions

No policy, delay cause, deductible, limit or actual covered expense is interpreted.

Numeric inputs must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Lists are limited to 100,000 entries; the rules above may require smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Title Policy Scope Comparison: Compare caller-supplied expected and observed records for title policy scope comparison. For a complementary task, use Recall Loss Split: Split product-recall loss across supplied coverage limits.

References

  1. Builder's Risk Soft-Cost Check — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies