Description
Compute availability = run/planned minutes, performance = idealCycleMinutes × totalUnits/runMinutes, and quality = goodUnits/totalUnits.
Production yields distinguish first-pass output, accepted rework, and final good units. Expected fractions, observed counts, and reporting bases should remain explicit.
Compute availability = run/planned minutes, performance = idealCycleMinutes × totalUnits/runMinutes, and quality = goodUnits/totalUnits.
When to use this tool
Use OEE Availability Performance Quality One Factor when you need one supplied yield, rework, or effectiveness component.
How to use the tool and how it works
- Enter plannedMinutes, runMinutes, totalUnits, goodUnits, idealCycleMinutes. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read availability, performance, quality, oee. Use the output convention below.
Compute availability = run/planned minutes, performance = idealCycleMinutes × totalUnits/runMinutes, and quality = goodUnits/totalUnits. Return idealCycleMinutes × goodUnits/plannedMinutes as oee.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| plannedMinutes | Planned Minutes | Required. Finite number; strictly above 0. |
| runMinutes | Run Minutes | Required. Finite number; strictly above 0. |
| totalUnits | Total Units | Required. Safe integer; minimum 1. |
| goodUnits | Good Units | Required. Safe integer; minimum 0. |
| idealCycleMinutes | Ideal Cycle Minutes | Required. Finite number; minimum 0. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| availability | Availability | Required. Finite number. |
| performance | Performance | Required. Finite number. |
| quality | Quality | Required. Finite number. |
| oee | Ideal-cycle good-unit time divided by planned time; not capped at one. | Required. Finite number. |
{
"input": {
"plannedMinutes": 480,
"runMinutes": 400,
"totalUnits": 1000,
"goodUnits": 950,
"idealCycleMinutes": 0.3
},
"output": {
"availability": 0.8333333333333334,
"performance": 0.75,
"quality": 0.95,
"oee": 0.59375
}
} Limitations and assumptions
- Performance and OEE are not capped at one; the time and ideal-cycle conventions are supplied and no industry reporting or equipment safety standard is validated.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Review process records and the relevant quality and time-accounting definitions before comparing production performance.
References
Similar or alternative tools
- Machine Yield Rework Base Gap
Add reworkedGood to firstPassGood only when countRework is true.
- Preventive Maintenance Cycle Availability Term
Add operatingHours, plannedMaintenanceHours, and repairHours for calendarHours.