Surge Cycle Period Reservoir

Estimate recharge/depletion surge-cycle timing from an explicit reservoir mass swing and fixed phase fluxes; thermal/hydraulic switching and actual surge occurrence are not predicted.

Description

An ideal surge reservoir accumulates mass during a quiet phase and loses it during an active phase.

An ideal surge reservoir accumulates mass during a quiet phase and loses it during an active phase. The mass swing divided by each net phase flux gives a cycle timescale.1

Estimate recharge/depletion surge-cycle timing from an explicit reservoir mass swing and fixed phase fluxes; thermal/hydraulic switching and actual surge occurrence are not predicted.

When to use Surge Cycle Period Reservoir

Use this for the following task: Estimate recharge/depletion surge-cycle timing from an explicit reservoir mass swing and fixed phase fluxes; thermal/hydraulic switching and actual surge occurrence are not predicted.

Prepare the measurements and calibration parameters in the declared units. Keep vector entries aligned and choose a consistent spatial frame and time basis.

How to use Surge Cycle Period Reservoir and understand its results

  1. Prepare the measurements and calibration parameters in the declared units. Keep vector entries aligned and choose a consistent spatial frame and time basis.
  2. Enter reservoirSwingKg, quietInflowKgPerYear, quietOutflowKgPerYear, activeInflowKgPerYear, activeOutflowKgPerYear using the field table, then run the tool.
  3. Read rechargeYears, activeDepletionYears, idealCycleYears. Interpret flags, units, ordering and placeholder values using the rules below.
  4. Review any reported issue or failed check, correct the supplied values when appropriate, and verify the result in its intended context.
Input fieldMeaningValue type and boundsRequirement
reservoirSwingKgReservoir swing kgnumberRequired
quietInflowKgPerYearQuiet inflow kg per yearnumberRequired
quietOutflowKgPerYearQuiet outflow kg per yearnumberRequired
activeInflowKgPerYearActive inflow kg per yearnumberRequired
activeOutflowKgPerYearActive outflow kg per yearnumberRequired

Require a positive reservoir swing, nonnegative gross fluxes and positive net recharge/depletion. Add the two durations for the ideal cycle.2

recharge = ΔM/(quiet in − out); depletion = ΔM/(active out − in)

This summarizes the declared operation. Units, indexing, inclusivity and exceptional cases are explained in the surrounding text.

Output fieldMeaningValue type
rechargeYearsRecharge yearsnumber
activeDepletionYearsActive depletion yearsnumber
idealCycleYearsIdeal cycle yearsnumber
json
{
  "input": {
    "reservoirSwingKg": 100,
    "quietInflowKgPerYear": 20,
    "quietOutflowKgPerYear": 10,
    "activeInflowKgPerYear": 20,
    "activeOutflowKgPerYear": 70
  },
  "output": {
    "rechargeYears": 10,
    "activeDepletionYears": 2,
    "idealCycleYears": 12
  }
}

Limitations and assumptions

This does not predict actual surge initiation or thermal/hydraulic switching; fixed phase fluxes are assumptions.

Constants and empirical coefficients are supplied rather than calibrated. Check units and observational applicability before interpreting the model. Malformed requests produce input errors. A successfully evaluated request can still contain false flags, empty result lists or a result outside the supplied threshold; those outcomes have the meanings stated above.

Alternative or Complementary methods

Choose Mass Turnover Time for this operation: Distinguish inventory/accumulation and inventory/loss turnover under supplied mass fluxes; neither is the dynamical terminus response time. For a complementary task, use Glacier Response Time Johannesson for this operation: Use Johannesson thickness/terminus-ablation response time with a linear exponential length-anomaly relaxation; no geometry-dependent higher-order response is inferred.

Further background: Glacier accumulation, ablation and mass balance.

References

  1. Glacier accumulation, ablation and mass balance — USGS

  2. Surge Cycle Period Reservoir — tool.io

Similar or alternative tools

  • Mass Turnover Time

    Distinguish inventory/accumulation and inventory/loss turnover under supplied mass fluxes; neither is the dynamical terminus response time.

  • Glacier Response Time Johannesson

    Use Johannesson thickness/terminus-ablation response time with a linear exponential length-anomaly relaxation; no geometry-dependent higher-order response is inferred.

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies