Description
Project a bank-retreat pin displacement using a supplied angle.
Geomorphic measurements distinguish signed coordinates, grain-size scales, profile derivatives and transported-mass or cross-section bases. A supplied datum adjustment or threshold does not detect a landform or establish a process. Plan distance, profile second derivative and slope-normalized curvature are different quantities.
Project a bank-retreat pin displacement using a supplied angle.
When to use this tool
Use Bank Retreat Pin Angle Projection when checking the stated local landform, sediment, profile or coordinate convention.
How to use the tool and how it works
- Enter measuredPinChange, angleFromRetreatAxisRadians. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read projectedRetreat. Use the output convention below.
Return measuredPinChange*cos(angleFromRetreatAxisRadians), preserving its sign.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| measuredPinChange | Measured Pin Change | Required. Finite number. |
| angleFromRetreatAxisRadians | Angle From Retreat Axis Radians | Required. Finite number. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| projectedRetreat | Projected Retreat | Required. Finite number. |
{
"input": {
"measuredPinChange": 10,
"angleFromRetreatAxisRadians": 0
},
"output": {
"projectedRetreat": 10
}
} Limitations and assumptions
- The angle is relative to the desired retreat axis; no actual pin alignment, bank motion or erosion process is determined.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Use calibrated surveys, mapped geometry and suitable complete sediment/terrain models for trends, process interpretation, uncertainty or hazard assessment.
References
Similar or alternative tools
- Catchment Outlet Elevation Drop Term
Calculate elevation drop to a supplied catchment outlet.
- Dune Migration Signed Baseline Offset
Measure signed dune migration relative to a supplied baseline coordinate.