Local duration and optional convexity approximation for an aligned yield shift; not an exact repricing.

Loading tool…

Description

Apply -price×modifiedDuration×yieldChange and optionally half×price×convexity×yieldChange²; add terms to price.

Risk and sensitivity terms depend on return units, horizon and model structure. A covariance contribution or local price approximation describes only part of a portfolio or instrument's risk and does not establish a safe investment.

Apply -price×modifiedDuration×yieldChange and optionally half×price×convexity×yieldChange²; add terms to price.

When to use this tool

Use Duration Yield First Order Price Gap when you need one explicit risk or sensitivity term.

How to use the tool and how it works

  1. Enter price, modifiedDuration, yieldChange, convexity, includeConvexity. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read durationChange, convexityChange, estimatedPrice. Use the output convention below.

Require positive price. Apply -price×modifiedDuration×yieldChange and optionally half×price×convexity×yieldChange²; add terms to price.1

Input fieldMeaning and unitsAccepted input
pricePriceRequired. Finite number; strictly above 0.
modifiedDurationModified DurationRequired. Finite number.
yieldChangeSigned rate fraction; 0.0001 means one basis point.Required. Finite number.
convexityConvexityRequired. Finite number.
includeConvexityInclude ConvexityRequired. Boolean.
Output fieldInterpretationReturned shape
durationChangeDuration ChangeRequired. Finite number.
convexityChangeConvexity ChangeRequired. Finite number.
estimatedPriceEstimated PriceRequired. Finite number.
json
{
  "input": {
    "price": 100,
    "modifiedDuration": 5,
    "yieldChange": 0.01,
    "convexity": 30,
    "includeConvexity": true
  },
  "output": {
    "durationChange": -5,
    "convexityChange": 0.15,
    "estimatedPrice": 95.15
  }
}

Limitations and assumptions

  • Yield change is a fraction, not basis points. Duration and convexity must match its convention; this is a local approximation and may produce negative estimated prices for unsuitable inputs.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Use the complete portfolio or instrument model, including covariance consistency, nonlinear effects and scenario analysis. Verify scaling and estimation assumptions before interpreting a partial term as total risk.

References

  1. Calculation and input contract: financial-economics/duration-yield-first-order-price-gap — tool.io

Similar or alternative tools