Description
Return presentFutureValue = permits*futurePrice/(1+annualRate)^years and netCarryValue = presentFutureValue-permits*currentPrice-storageCost.
Discounting expresses a future amount on a chosen present-value basis. The rate must match the period and compounding convention, while the currency price year and the choice of social or private discount rate remain separate assumptions.
Return presentFutureValue = permits*futurePrice/(1+annualRate)^years and netCarryValue = presentFutureValue-permits*currentPrice-storageCost.
When to use this tool
Use Pollution Permit Bank Carry Cost Term when checking one supplied discount, accrual or carry-value contribution.
How to use the tool and how it works
- Enter permits, currentPrice, futurePrice, annualRate, years, storageCost. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read presentFutureValue, netCarryValue. Use the output convention below.
Require nonnegative permits and storageCost, annualRate > -1 and years >= 0. Return presentFutureValue = permits*futurePrice/(1+annualRate)^years and netCarryValue = presentFutureValue-permits*currentPrice-storageCost.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| permits | Permits | Required. Finite number; minimum 0. |
| currentPrice | Current Price | Required. Finite number. |
| futurePrice | Future Price | Required. Finite number. |
| annualRate | Effective annual rate as a fraction, for example 0.03 for 3%. | Required. Finite number; strictly above -1. |
| years | Elapsed years matching the annual effective rate, possibly fractional. | Required. Finite number; minimum 0. |
| storageCost | Present-valued total storage cost in the same currency as the discounted proceeds. | Required. Finite number; minimum 0. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| presentFutureValue | Present Future Value | Required. Finite number. |
| netCarryValue | Net Carry Value | Required. Finite number. |
{
"input": {
"permits": 100,
"currentPrice": 10,
"futurePrice": 12,
"annualRate": 0.1,
"years": 1,
"storageCost": 20
},
"output": {
"presentFutureValue": 1090.9090909090908,
"netCarryValue": 70.90909090909076
}
} Limitations and assumptions
- Prices share one currency per permit and annualRate is an effective fraction. storageCost is deducted as a present-valued amount; permit validity, borrowing rules, uncertainty and actual trading opportunities are not established.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Use a justified rate convention and complete cashflow schedule, including uncertainty and timing, when evaluating a real policy or investment.
References
Similar or alternative tools
- Environmental Discount Period Factor
Return discountFactor = exp(-periods*log1p(effectiveRate)), equal to (1+effectiveRate)^(-periods).
- Pollution Cost Population Share Tool
Calculate pollution cost population share from explicit caller-supplied inputs.