Tariff Block Marginal Charge

Price only the overlap of added usage with one explicit tariff block without constructing a complete bill.

Loading tool…

Description

Calculate added usage falling inside one supplied tariff block.

Energy prices and charges depend on energy units, demand units, standing-charge days, tariff periods and settlement sign conventions. Purchased-energy losses differ from delivered-energy fractions, and signed prices can produce negative monetary terms. Nominal battery cost allocations are supplied scenarios rather than physical aging forecasts.

Calculate added usage falling inside one supplied tariff block.

When to use this tool

Use Tariff Block Marginal Charge when you already have usageBefore, addedUsage, blockLower, blockUpper, pricePerUnit and need to calculate added usage falling inside one supplied tariff block.

How to use the tool and how it works

  1. Enter usageBefore, addedUsage, blockLower, blockUpper, pricePerUnit. Use the units and conventions below.
  2. Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
  3. Read addedUsageInBlock, blockCharge. Use the output convention below.

Require nonnegative usageBefore/addedUsage/blockLower/price and blockUpper>blockLower; overlap=max(0,min(before+added,upper)-max(before,lower)), charge=overlap*price.1

Input fieldMeaning and unitsAccepted input
usageBeforeUsage BeforeRequired. Finite number; minimum 0.
addedUsageAdded UsageRequired. Finite number; minimum 0.
blockLowerBlock LowerRequired. Finite number; minimum 0.
blockUpperBlock UpperRequired. Finite number.
pricePerUnitPrice Per UnitRequired. Finite number; minimum 0.
Output fieldInterpretationReturned shape
addedUsageInBlockIncremental cumulative-usage interval overlapping this one tariff block, not total usage in all blocks.Required. Finite number.
blockChargeBlock ChargeRequired. Finite number.
json
{
  "input": {
    "usageBefore": 90,
    "addedUsage": 30,
    "blockLower": 100,
    "blockUpper": 200,
    "pricePerUnit": 0.2
  },
  "output": {
    "addedUsageInBlock": 20,
    "blockCharge": 4
  }
}

Limitations and assumptions

  • This covers one block's incremental usage, not the complete bill. Block units, accumulation period and tariff order are supplied; extreme arithmetic can lose precision.
  • Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
  • Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.

Alternative or Complementary methods

Reconcile the actual meter series, tariff, contract and billing definitions for an account or market question. Use a complete cash-flow or physical-energy model when needed; a single block overlap, index ratio or supplied settlement term cannot establish actual charges or performance.

References

  1. Calculation and input contract: energy-economics/tariff-block-marginal-charge — tool.io

Similar or alternative tools