Mark Versus Full Out Energy Budget Rehearsal

Reconcile actual marked/full-out duration ledger with independently calibrated additive caller effort units; no default calories/METs, recovery model, fatigue threshold or safe load clearance.

Description

Marked and full-out rehearsal effort can use distinct measured unit rates.

Marked and full-out rehearsal effort can use distinct measured unit rates. The budget is in the caller’s calibrated units.1

Enter aligned nonempty nonnegative durations/binary mode codes 0 marked,1 full-out, and nonnegative calibrated rates/budget. Return separate and total effort plus signed budget margin.

When to use Mark Versus Full Out Energy Budget Rehearsal

Use Mark Versus Full Out Energy Budget Rehearsal when you need to evaluate the supplied records under the calculation and evidence rules below. No default calories/METs, fatigue/recovery model or safe load clearance is supplied.

Prepare the annotated dance, timing, rehearsal or inventory records requested. Supply caller rules, evidence flags and local reference values; distinguish beats, bars, counts and seconds.

How to use Mark Versus Full Out Energy Budget Rehearsal and understand its results

  1. Prepare the annotated dance, timing, rehearsal or inventory records requested. Supply caller rules, evidence flags and local reference values; distinguish beats, bars, counts and seconds.
  2. Enter observedRunDurationsMinutes, callerMarkedOrFullOutCodes, callerMeasuredMarkEffortUnitsPerMinute, callerMeasuredFullEffortUnitsPerMinute, callerEffortUnitBudget using the field table and calculation rules, then run the tool.
  3. Read markedRunEffortUnits, fullOutRunEffortUnits, totalModeledEffortUnits, signedEffortBudgetMarginUnits. The explanation below defines the units, signs, ordering and any flags or placeholder values.
  4. If the tool reports an input issue, correct the values and run it again. Apply the stated assumptions when interpreting a successfully returned result.
Input fieldMeaningValue type; see rules belowRequirement
observedRunDurationsMinutesObserved run durations minuteslist of numberRequired
callerMarkedOrFullOutCodesCaller marked or full out codeslist of numberRequired
callerMeasuredMarkEffortUnitsPerMinuteCaller measured mark effort units per minutenumberRequired
callerMeasuredFullEffortUnitsPerMinuteCaller measured full effort units per minutenumberRequired
callerEffortUnitBudgetCaller effort unit budgetnumberRequired

Enter aligned nonempty nonnegative durations/binary mode codes 0 marked,1 full-out, and nonnegative calibrated rates/budget. Return separate and total effort plus signed budget margin.

effort=markedMinutes×markedRate+fullMinutes×fullRate

Units, indexing, boundary conditions and exceptional cases are defined in the calculation rules above.

Output fieldMeaningValue type
markedRunEffortUnitsMarked run effort unitsnumber
fullOutRunEffortUnitsFull out run effort unitsnumber
totalModeledEffortUnitsTotal modeled effort unitsnumber
signedEffortBudgetMarginUnitsSigned effort budget margin unitsnumber
json
{
  "input": {
    "observedRunDurationsMinutes": [
      10,
      10,
      5
    ],
    "callerMarkedOrFullOutCodes": [
      0,
      1,
      0
    ],
    "callerMeasuredMarkEffortUnitsPerMinute": 1,
    "callerMeasuredFullEffortUnitsPerMinute": 3,
    "callerEffortUnitBudget": 40
  },
  "output": {
    "markedRunEffortUnits": 15,
    "fullOutRunEffortUnits": 30,
    "totalModeledEffortUnits": 45,
    "signedEffortBudgetMarginUnits": -5
  }
}

Limitations and assumptions

No default calories/METs, fatigue/recovery model or safe load clearance is supplied.

Numeric inputs, where present, must be finite. Follow the calculation-specific rules for overflow, underflow and exceptional cases. Numeric lists are limited to 10,000 entries; string lists to 128 strings of at most 128 characters each. The rules above may impose smaller limits. Missing required fields, extra fields, wrong value types and violations of the calculation rules are input errors.

Alternative or Complementary methods

Use Work-Rest Cycle Energy Expenditure Average Calculator: A mixed work/rest cycle uses time weighting to combine metabolic demand. Rest classification and its energy rate are separate evidence. For a complementary task, use Overuse Injury Weekly Hours Load Threshold Flag: Weekly-hour review triggers can compare observed totals and relative increases. A zero prior week cannot define a percentage baseline.

References

  1. Mark Versus Full Out Energy Budget Rehearsal — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies