Rock-ripping production can be summarized as observed volume per machine hour.

Rock-ripping production can be summarized as observed volume per machine hour.1

This tool calculates that rate from supplied production volume and operating hours.

When to use Rock Ripper Production Calculator

Use this tool to calculate that rate from supplied production volume and operating hours.

How to use Rock Ripper Production Calculator and how it works

  1. Prepare actualQualifiedExcavatedRockVolume, actualObservedMachineHours, with the units, conventions and assumptions below.
  2. Enter the required fields and run Rock Ripper Production Calculator.
  3. Read result.value using the output definitions below.
  4. Correct any rejected inputs and rerun; interpret the result within the stated model and its assumptions.
Input fieldMeaningValue typeRequirement
actualQualifiedExcavatedRockVolumeActual Qualified Excavated Rock Volume. Use the units and matching context stated in the calculation below.numberRequired; nonnegative; finite; other constraints below
actualObservedMachineHoursActual Observed Machine Hours. Use the units and matching context stated in the calculation below.numberRequired; strictly positive; finite; other constraints below

Supply nonnegative observed rock volume and positive machine operating hours. Return volume/hours in the observed volume unit per hour. This summarizes a supplied observation rather than predicting a machine's future production.

productionPerHour=observedRockVolume/machineHours

Apply the input ordering, units and branch conditions stated above.

Output fieldMeaningValue type
resultObject containing the calculated or selected fields below.object
result.valueObserved rock volume per machine hour.number
json
{
  "input": {
    "actualQualifiedExcavatedRockVolume": 10,
    "actualObservedMachineHours": 2
  },
  "output": {
    "result": {
      "value": 5
    }
  }
}

Limitations and assumptions

The calculation uses the supplied observations and model inputs. It does not collect measurements, select a reference population or coefficient, or establish that the model applies to the actual case. The stated branch conditions and output units remain part of the result.

All fields require explicit values. Unexpected fields, wrong types, nonfinite numbers and sparse arrays are rejected. Alignment, bounds and supported-token rules are explained above; extremely large inputs or nonfinite results can also fail. Input errors differ from successful false comparisons, unavailable-domain flags and empty match lists.

Alternative or Complementary methods

Use Spoil Pile Volume Calculator for a complementary operation: Excavated soil often occupies a different loose volume from its original bank volume.

Use Excavation Benching Steps Calculator for a complementary operation: Excavation benches depend on ground conditions, geometry and applicable protective-system requirements.

References

  1. Rock Ripper Production Calculator — tool.io

Similar or alternative tools

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies