Description
Preserve supplied handover date and warranty-start source metadata.
Construction records combine revisions, dates, dimensions, rental periods, claims and financial balances. Revision numbers need not be consecutive, calendar offsets differ from business days, and recoverable length can depend on a strict cutoff. A supplied approval or readiness label is a record assertion rather than an engineering inspection or contractual determination.
Preserve supplied handover date and warranty-start source metadata.
When to use this tool
Use Project Handover Warranty Start Label when you already have projectId, handoverDateText, warrantySource and need to preserve supplied handover date and warranty-start source metadata.
How to use the tool and how it works
- Enter projectId, handoverDateText, warrantySource. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read token. Use the output convention below.
Enter projectId, handoverDateText, warrantySource using the field constraints below. Encode these values, in exactly that order, as a JSON array and return the serialized array as text in token. String values are preserved without trimming or external terminology lookup.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| projectId | Project Id | Required. Text; minimum UTF-16 length 1; maximum UTF-16 length 8192. |
| handoverDateText | Handover Date Text | Required. Text; minimum UTF-16 length 1; maximum UTF-16 length 8192. |
| warrantySource | Warranty Source | Required. Text; minimum UTF-16 length 1; maximum UTF-16 length 8192. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| token | Token | Required. Text; maximum UTF-16 length 8192. |
{
"input": {
"projectId": "P17",
"handoverDateText": "2026-11-01",
"warrantySource": "clause 4"
},
"output": {
"token": "[\"P17\",\"2026-11-01\",\"clause 4\"]"
}
} Limitations and assumptions
- The result records supplied values without interpreting warranty commencement. Sources and asserted relationships are not independently authenticated.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
Alternative or Complementary methods
Check controlled drawings, site measurements, schedules, approvals and the complete contract. Use the appropriate engineering assessment and actual billing or claim terms when a local scalar calculation or date comparison cannot establish suitability or entitlement.
References
Similar or alternative tools
- Commissioning Step Sign Off Label
Label a supplied commissioning step's recorded sign-off status.
- Retention Payment Release Balance
Update a supplied retention balance after additions and release.