Description
Return a drawing prefix's supplied rank and revision number.
Construction bookkeeping distinguishes installed, accepted, credited and reworked quantities, as well as contractual cost and schedule conventions. A local variance or budget term can expose a gap without verifying work quality, payment entitlement or the project critical path.
Return a drawing prefix's supplied rank and revision number.
When to use this tool
Use Drawing Revision Prefix Order when checking a supplied construction quantity, charge, record or schedule convention.
How to use the tool and how it works
- Enter prefix, number, suppliedPrefixes. Use the units and conventions below.
- Run the tool. Correct any format, range, or cross-field input error before interpreting the output.
- Read prefixRank, revisionNumber. Use the output convention below.
Return a drawing prefix's supplied rank and revision number. Require nonnegative whole number, unique suppliedPrefixes and a recognized prefix; prefixRank is its zero-based index.1
| Input field | Meaning and units | Accepted input |
|---|---|---|
| prefix | Prefix | Required. Text; maximum UTF-16 length 8192. |
| number | Number | Required. Safe integer; minimum 0. |
| suppliedPrefixes | Supplied Prefixes | Required. Array of text; maximum UTF-16 length 8192; maximum items 256. |
| Output field | Interpretation | Returned shape |
|---|---|---|
| prefixRank | Prefix Rank | Required. Safe integer. |
| revisionNumber | Revision Number | Required. Safe integer. |
{
"input": {
"prefix": "P",
"number": 3,
"suppliedPrefixes": [
"P",
"C"
]
},
"output": {
"prefixRank": 0,
"revisionNumber": 3
}
} Limitations and assumptions
- The vocabulary and order are supplied, not an industry revision standard or evidence that a drawing is current.
- Inputs must satisfy both the field types and the cross-field conditions above. Invalid input causes an error; a successful false flag or documented placeholder is a different result.
- Numeric calculations use binary floating point unless exact decimal-integer arithmetic is explicitly stated. No hidden measurement tolerance or decimal rounding is added; nonfinite or out-of-contract results are rejected. Numeric signed-zero results are exported as zero.
Alternative or Complementary methods
Use verified project records, a complete schedule and governing contracts; involve qualified construction, engineering or legal professionals for practical decisions.
References
Similar or alternative tools
- Public Statute Version Token
Split a statute reference and version at the last separator.
- Literary Title Article Sort Rule
Remove the longest supplied leading title article for sorting.