Spring Neap Factor Calculator

Compute the spring/neap modulation factor from factor = abs(cos(2 * PI * lunarAgeDays / 29.53)); one means spring tides and zero means neap tides.

Description

Compute the spring/neap modulation factor from factor = abs(cos(2 * PI * lunarAgeDays / 29.53)); one means spring tides and zero means neap tides.

Spring Neap Factor Calculator: Compute the spring/neap modulation factor from factor = abs(cos(2 * PI * lunarAgeDays / 29.53)); one means spring tides and zero means neap tides.

When to use Spring Neap Factor

Use this sailing calculation as a planning or educational cross-check for navigation, wind and current, rig loads, stability, anchoring, tides, visibility, performance, or recovery under explicitly stated conditions.

Lunar age (d)
Age of the moon in days since new moon, 0 to 29.53.

How Spring Neap Factor works

Compute the spring/neap modulation factor from factor = abs(cos(2 * PI * lunarAgeDays / 29.53)); one means spring tides and zero means neap tides. The tool evaluates the supplied inputs together and returns the named outputs below; it does not infer omitted operating conditions or change the units shown.1

Spring/neap factor
Spring/neap factor between zero (neap) and one (spring).

Limitations and assumptions

  • Actual conditions change with vessel design and loading, sea state, wind, current, tide datum, weather, chart accuracy, equipment, crew, regulations, and safety margins. Simplified formulas do not replace seamanship, approved stability data, or current navigation information.
  • Use finite inputs in the displayed units and preserve more precision than the final presentation requires. Independently verify safety-critical, financial, compliance, or production decisions.

Alternative or Complementary approaches

Cross-check official charts, tide and weather services, instrument data, vessel manuals, and collision regulations; maintain conservative margins and a safe alternative plan.

References

  1. Marine weather forecasting — Wikipedia contributors

Similar or alternative tools

  • Tide Height Cosine Curve

    Interpolate tide height on a cosine curve from heightM = lowWaterMeters + (highWaterMeters - lowWaterMeters) * (cos(PI * hoursFromHigh / 6) + 1) / 2.

  • Drying Height Clearance

    Compute the water depth over a charted drying patch by subtracting its drying height from the height of tide; a negative result means the patch remains exposed.

  • Overfalls Risk Factor

    Estimate the severity of overfalls from the spring tidal range, maximum stream rate, and water depth.

Don't forget to set a bookmark for tool.io!
Privacy | Imprint | Cookies